Canada
A 5-Million Village for Foster Kids, Built With Private Money, Not Tax Dollars
The Hall Family Foundation wants 10 big homes in Glenmore where up to 40 children in care can stay put.
Sure Bet Media

Sure Bet Media

Nov 26, 2026

0 Comments

Listen to this story:

 

The quick read: The Hall Family Foundation wants to build a $15-million foster care village in Kelowna's Glenmore area: 10 five-bedroom homes and a support hub for up to 40 children in care at a time. It would be privately funded, with no taxpayer money for construction. The land is not secured yet and rezoning is still needed, with construction targeted for 2027 and families moving in by 2028.

 

Some of the most vulnerable kids in Kelowna may soon have a real neighbourhood to call home.

 

The Hall Family Foundation is proposing a $15-million foster care village in Kelowna's Glenmore area, built to give children in care something the system too often fails to provide: stability.

 

The plan calls for 10 five-bedroom homes and a roughly 5,000-square-foot support hub, designed to house up to 40 foster children at a time, along with foster parents and support staff.

 

The idea is simple. Instead of scattering kids across whatever beds happen to be available, keep siblings together in one community, with support on site, for their whole time in care.

 

That matters because the current system is buckling.

 

Marcy Perron, president of the B.C. Federation of Foster Parents, says the number of foster homes in the province has fallen to about 2,000, down from roughly 5,000 when she started in the field.

 

High housing costs are a big reason. In a city where a family-sized home is out of reach for most working people, asking a family to take in extra children is asking a lot.

 

The result is a long waiting list, and children placed in temporary hotel rooms while the system scrambles for a bed.

 

A typical foster child moves seven times before turning 18, according to reporting on the project.

 

Seven moves. Seven new bedrooms, seven new schools, seven fresh starts before adulthood.

 

That is the problem this village is trying to solve.

 

Here is the part worth noting: the foundation says no taxpayer money is expected to be used for construction.

 

The proposed site is on privately owned land in Glenmore, and the project would be privately funded.

 

Ed Hall, who sits on the foundation's board, told Global News the foundation did not want to spend too much money on renderings.

 

It wanted to spend the money on actually building the houses.

 

That is the right instinct, but there is still a long road ahead.

 

The land has not been secured yet, and the project still needs rezoning and other approvals from the City of Kelowna.

 

The foundation hopes construction can begin in 2027, with families moving in by 2028.

 

It is also worth noting the timing. Kelowna-Centre MLA Kristina Loewen was appointed Minister of Children and Family Development when the new provincial government was sworn in on November 20, so the minister responsible for kids in care now represents this city.

 

Private generosity, public need.

 

This is how a community is supposed to work.

 

A private foundation sees a problem the government cannot fix on its own, puts up its own money, and builds something real.

 

No grant application. No ten-year study. No taxpayer bill.

 

Just homes for kids who need them, built by people who decided to do something instead of waiting for someone else to.

 

That does not mean the project should get a free pass on the details.

 

Rezoning matters. Neighbours in Glenmore deserve a straight answer about traffic, density, and what the support hub will actually do.

 

And a village is only as good as the people running it, so the foundation will need to show it has the foster parents and the staff to make this work, not just the buildings.

 

But the model is the right one: private money, local leadership, and a clear goal.

 

Forty kids who stop moving every few months. Forty kids with a bedroom that stays theirs.

 

That is worth building, and worth building fast.

 

Kelowna should hope the approvals move as quickly as the intention. These kids have waited long enough.

 

Sources: Global News, November 24, 2026; The Northern Current, November 25, 2026.

0 Comments

Join the conversation

Be the first to comment

Share your thoughts above.

kelownashoutout.com

© 2026 kelownashoutout.com.

Kelowna Shoutout brings you local stories, news, and voices that define British Columbia’s Okanagan Valley. Subscribe for lively updates, event highlights, and community insights straight from the heart of Kelowna.

© 2026 kelownashoutout.com.